As an affordable and friendly solution, rooftop solar installation nowadays becoming more popular in 2025 among the residents and management committees.
Once again, the question remains: What will be the Rooftop Solar Cost for high-rises in Mumbai?
Ask yourself why the solar costs of two buildings in the same location differ.
Rooftop solar cost in high-rise is influenced by several factors:
- Building height and structure: For safe wiring and installation, high-rise structures need special technical equipment.
- Available rooftop space: More and more capacity and greater savings with a larger, shadow-free area.
- System size is also determined by requirements and the number of units required.
- The cost of solar panels differs depending on their type: basic or premium.
- Efficiency and system costs are impacted by inverter technology and quality.
So, the Rooftop solar cost can easily differ from one society to another.
Is solar still a smarter move for housing societies with a low budget?
Here’s the Good News, the solar panel price in 2025 will be more affordable.
Because Mass manufacturing and government initiatives are the reason behind the overall installation costs for high-rise buildings going down.
Also, the Ministry of New and Renewable Energy (MNRE) offers subsidies to cooperative housing societies.
Not only this, you can also save money through net metering, where the extra electricity produced by your system is sent back to the grid, and you get paid and credited for this.
Thus, solar turns from a big expense into an investment that begins to pay for itself.
Yes, if your society meets some simple conditions:
- Your rooftop area receives plenty of sunlight.
- Basic documentation (like electricity bills, society registration, and property details) can be provided by your society.
- For long-term savings, you're open to a one-time setup.
With this scheme, switching to solar energy becomes affordable, practical, and rewarding.
It’s an intelligent move for both the environment and your wallet.
Estimated System Cost: ₹11 to ₹13 lakhs
Government Subsidy (MNRE): ₹2.5 to ₹4 lakhs
Final Cost After Subsidy: ₹7 to ₹9 lakhs
What will you get in Return?
- 15,000 to 20,000 units of electricity per year.
- Up to 70% savings on your society’s electricity bill.
- Long-term power with low maintenance.
- Green, renewable energy for years to come.
Thus, now is the best moment to take action if your building is ready.
We at Rising Sun Electric will simplify everything.
We support you at every stage, from helping your society understand the MNRE laws to calculating costs and securing your subsidy.
Each demo built with Teba will look different. You can
customize
anything
appearance of your website with only a few clicks